In Tashkent, working groups restored power supply in 228 apartment buildings and three social facilities

    Social medium 18 January 2023 1533

    As of January 17, heating networks have been repaired in 97 apartment buildings. Electrical cables have been replaced in 102 apartment buildings. Pipes in the basement of 32 apartment buildings, elevators of 4 houses, 34 electrical panels and 7 transformer equipment were repaired.

    This was announced at a briefing in the IMC by the head of the Department of the Ministry of Construction and Housing and Communal Services Obidjon Muminov:

    87,335 entrances of apartment buildings have been cleared of snow. On an area of 698,016 sq. the sand-salt mixture was filled in.